TL;DR: In Singapore, the delivered quantity on the bunker delivery note (BDN) is set by the bunker tanker's MPA-approved mass flow meter (MFM), not by ship's soundings. Disputes still happen because the receiving ship measures by volume and converts to mass, which brings in density, temperature, trim and tank calibration errors. The way to settle one is evidence: the MFM delivery record, the e-BDN, the surveyor's report, the ship's own soundings, the MARPOL sample and a Letter of Protest issued at the time. Raise it on the spot, keep everything, and check your supply contract's notice period that day.
A bunker quantity dispute is a disagreement between the receiving ship and the supplier over how much fuel was delivered. In Singapore, mass flow metering has made these disputes rarer but has not ended them. This guide is for owners, superintendents and bunker craft operators who need to know what the evidence is and what to do in the first hour after the figures fail to match.
Why do bunker quantity disputes still happen after MFM?
Disputes still happen because the two sides measure differently. The bunker tanker’s MFM measures mass directly as fuel passes through the meter. The receiving ship usually measures volume, by sounding or ullaging its tanks before and after delivery, then converts that volume to mass using the fuel’s density at 15°C and a temperature correction.
Every step in that conversion can drift. Calibration tables may be old, trim and list corrections misapplied, or the temperature taken at one point in an unevenly heated tank. The BDN density is the supplier’s figure, and a later laboratory test may differ. Small errors at each step add up to a few tonnes on a large stem, which is enough to start a claim.
That is the reason the ship’s figure should be treated as a check on the meter, not as a rival measurement. If the ship’s figure is consistently short across several deliveries from different suppliers, the problem is more likely on board.

How MFM changed the numbers
Since 1 January 2017, MPA has required an MPA-approved MFM system for marine fuel oil deliveries in the Port of Singapore, and the requirement was extended to distillates such as marine gas oil from 1 July 2019. MPA states that the delivered quantity on the BDN is based on the bunker tanker’s MFM system, as witnessed by the cargo officer, the receiving ship’s chief engineer and the bunker surveyor if one is engaged.
Before MFM, quantity was taken from soundings of the barge’s tanks, which left room for what the industry called “cappuccino bunkers”: air entrained in the fuel so the sounded volume looked higher than the fuel transferred. Measuring mass at the meter closed most of that gap.
The metering code is now SS 648:2024, the Singapore Standard code of practice for bunker mass flow metering. MPA’s Port Marine Circular No. 12 of 2024 sets out that it replaces SS 648:2019, whose use ceased from 1 April 2025. The revision added data integrity and transmission requirements for data loggers and edge devices, and reorganised the bunker claims and dispute resolution content. The general bunkering code, SS 600:2022, superseded SS 600:2014 from 1 January 2023 and sets the procedure if an MFM system fails mid-delivery, in which case the supplier or craft operator needs MPA’s permission before continuing.
The documents that decide a dispute
A quantity dispute is decided on documents, so it helps to know what each one proves. The table below sets out the main records in a Singapore delivery.
Record | Who produces it | What it shows | Why it matters in a dispute |
|---|---|---|---|
MFM delivery record | Bunker tanker’s metering system | Mass delivered, start and end of transfer | The custody-transfer figure the BDN is based on |
e-BDN | Supplier, through an MPA-whitelisted platform | Product, quantity in tonnes, density at 15°C, sulphur, supplier declaration | The statutory delivery record; can be verified with MPA |
Bunker surveyor’s report | Licensed bunker surveying company | Independent witness of the delivery and measurements | Third-party evidence if the parties disagree |
Ship’s sounding and calculation sheets | Receiving ship’s engineers | Volume received, converted to mass | The ship’s check figure and basis of any claim |
MARPOL sample and commercial samples | Drawn during delivery, sealed, seal numbers on BDN | The fuel actually delivered | Settles density and quality questions later |
Letter of Protest | Master or chief engineer | Formal notice that the quantity is disputed | Preserves the claim and the record |
The e-BDN
Since 1 April 2025, suppliers in Singapore issue electronic BDNs as the default, using solutions whitelisted by MPA. MPA’s digital bunkering page explains that vessel owners and banks can verify an e-BDN through MPA’s e-BDN record enquiry on the digitalPORT@SG portal. In a dispute, that confirms the record you hold matches what was reported to MPA.
The BDN and MARPOL sample under Annex VI
The BDN is also a statutory document under MARPOL Annex VI. IMO’s guidance on regulation 18 requires ships holding an IAPP Certificate to keep the BDN on board for at least three years after delivery. The representative MARPOL sample must stay under the ship’s control until the fuel is substantially consumed, and for not less than 12 months from delivery. Commercial samples drawn at the same time normally go to the laboratory in a commercial dispute, but keep both intact.
The bunker surveyor
Bunker surveying companies working in the Port of Singapore have had to be licensed by MPA since 1 January 2017, and MPA listed 36 licensed companies as at 7 July 2026. An independent surveyor gives the owner a witness who checks meter seals, records readings and observes the transfer. On a large stem, or with an unfamiliar supplier, we think the fee is cheap insurance.
What to do when the figures don’t match
Act on the day, while the bunker tanker is still alongside if possible. Once the craft has cast off and the paperwork is signed without remarks, a claim gets much harder.
Re-check the ship’s figures first: soundings, temperatures, trim and list, the tank calibration tables used, and the arithmetic.
Ask to see the MFM readings and the meter’s seals, and check that the start and end figures match what was witnessed.
Ask the bunker surveyor, if one attended, for a copy of their measurement record.
If the difference remains, the master or chief engineer issues a Letter of Protest to the supplier and bunker tanker, stating the BDN figure, the ship’s figure and the basis for it. Photographs of readings and seals help.
Keep all samples sealed, with seal numbers recorded on the BDN, and secure the e-BDN, the MFM printout or data, and the ship’s calculation sheets.
Notify the charterer or owner, the ship manager and the P&I club or claims handler the same day.
Then read the supply contract. Bunker terms commonly set short time limits for notifying a quantity claim, and missing one can lose a claim that was otherwise sound. SS 600:2022 includes provisions on dispute resolution through the Singapore Chamber of Maritime Arbitration (SCMA) and the Singapore Bunker Claims (SBC) Terms, and whether those apply depends on what your contract says.
Where MPA fits in
MPA licenses suppliers and bunker tankers and monitors their performance, but it is not a claims tribunal. What it does provide is a feedback channel with consequences. Under MPA’s bunker supplier licensing conditions, suppliers must enter customer feedback for every bunkering operation into the MPA system, rated 1 to 5 by the vessel’s master or chief engineer, and low annual averages attract demerit points. A poor delivery should be scored honestly. For concerns about a supplier’s conduct, MPA directs enquiries to its feedback form at mpa.gov.sg/feedback and its bunkering contact lines.
The operator’s perspective: the bunker craft side
For a bunker craft operator, the best defence against a quantity claim is a metering system and crew that stand up to scrutiny: the MFM maintained and verified on schedule, seals intact and recorded, the data logger meeting SS 648:2024’s integrity requirements, and the same procedure on every delivery. When an operator can hand over a clean MFM record, a matching e-BDN and a surveyor’s report, most claims end quickly.
Our view, from managing bunker craft in Singapore, is that a large share of remaining quantity disputes come from the receiving side: calibration tables that nobody has questioned in years, temperature taken in the wrong place, or a rushed calculation at the end of a long watch. That is an interpretation, not a statistic, but it is why we put as much effort into the receiving ship’s bunkering procedure as into the barge’s. Our pages on bunker vessel management in Singapore and bunker barge management cover the maintenance and metering side, and how we approach bunker fleet management covers procedures and crew.
Paperwork discipline also matters beyond the claim. MARPOL Annex VI records are checked during port state control, so a missing BDN or an unaccounted sample is a deficiency risk as well as a commercial one, a point we cover in our guide to PSC inspections and detention risk. If you are new to the process, start with what bunkering in shipping involves.

Frequently Asked Questions
Who decides the delivered quantity in a Singapore bunker delivery? The bunker tanker’s MPA-approved mass flow meter. The BDN quantity is based on the MFM system, witnessed by the cargo officer, the chief engineer and the bunker surveyor if one is engaged.
What is a bunker delivery note? A BDN is the supplier’s record of the fuel delivered, including product, quantity in tonnes, density at 15°C and sulphur content, with a declaration of MARPOL Annex VI compliance. Under regulation 18 it must be kept on board for at least three years.
Is the e-BDN mandatory in Singapore? Since 1 April 2025, suppliers in Singapore issue e-BDNs as the default using MPA-whitelisted platforms. Owners and banks can verify an e-BDN through MPA’s record enquiry on digitalPORT@SG.
What is a Letter of Protest in bunkering? It is a formal written notice from the master or chief engineer that the ship disputes the delivered quantity or another aspect of the delivery. It preserves the claim and records the ship’s figures at the time.
Do I need a bunker surveyor if the barge has an MFM? Not by law, but an independent licensed surveyor gives you a witness to the meter readings and seals. On large stems or with unfamiliar suppliers, it is worth the cost.
Quick Q&A
The ship is short by two tonnes. Should we protest? Re-check your own figures first. If the gap survives that check, protest in writing before the barge leaves and keep all samples and records.
Can the MFM figure be challenged? Yes, with evidence such as broken seals, readings that do not match what was witnessed, or a metering fault. A gap based only on ship’s soundings is a weak case against a verified meter.
Who pays for the bunker survey? Usually the party that appoints the surveyor. Check your supply or charter terms.
Getting your bunkering procedures dispute-proof
Emaris Shipping manages tankers and bunker craft in Singapore, Malaysia and Indonesia. We set up bunkering procedures, record-keeping and crew training on both sides of the hose, and our digital compliance and operational systems keep BDNs, sample logs and MFM records audit-ready. For an independent review of your bunkering practice, see our marine audits, surveys and consultancy service, or contact us.
This article is general operational guidance, not legal advice. For a live claim, take advice on your contract terms.